HVO North and South are separated by the Hunter River and collectively form the HVO Complex (HVO) which is operated as a fully integrated operation. HVO is operated by HVO Joint Venture which is a 51:49 unincorporated JV between Yancoal Australia and Glencore Coal Assets Australia (GCAA), respectively. HVO North includes the Carrington Pit, West Pit (which includes the Mitchell Pit), North Pit Tailings Storage Facility (TSF), Dam 6W TSF, Cumnock Void TSF (under agreement with GCAA), Newdell Coal Preparation Plant (NCPP), Hunter Valley Coal Preparation Plant (HVCPP), Howick Coal Preparation Plant (HCPP), and the stockpiling/train loading facilities at Newdell Load Point (NLP) and Hunter Valley Load Point (HVLP). HVO South includes Chestnut Pit, Riverview Pit (North and South) and Lemington South Pit No. 1 and 2.